READY -MIX CONCRETE :C 40/10 (SRC)- SCREED
The rates are based on minimum load of 5m3/truck/trip and 200/truck is applicable for orders for less than 5M3/truck/trip
Mobile pump-42 meter or less AED 15 /M3, Minimum Charge : 500/pour
Stationary Pump AED 15/M3, Minimum Charge 20000/Month
Gout for priming pump/pipelines , Minimum Charge 400/Trip
Stationary Normal pipeline AED12/M3, Minimum Charge 12000/Month
Temporary Pipeline AED 10/M3 ,Minimum Charge 500/Pour
Manual distributor AED 10/M3, Minimum Charge 1000/Pour
Hydraulic placing boom, AED 18000/month
Temperature degree : Greater than 30 degree celsius AED 10/M3
Temperature degree : Greater than 32 degree celsius AED 15/M3
Concrete will be temperature controlled at 32 degree Celsius maximum throughout the year and charge will apply throughout the year unless lower temperatures are specified